Service charges

The price list is valid from July 1, 2021.

The price list includes

Service charges

Fees for activating and deactivating electricity due to late payment

Electricity activation fee at the start of the network agreement

Replacement of a network service product

Compensation calculation service

Replacing the main fuse

Activation fees

Metering fees

Installer's hourly rate (e.g., street and traffic lights, electricity, telecommunications and distribution networks, mapping, and cable display)

Charge for vehicles and transport (driver at a separate hourly rate)

Other charges (such as materials, extra fees, external services, etc.)

Service charges include 24% VAT.

Product
Price (VAT 0%) Price (VAT 24%)
Document fee
Review, certificate, extra payment.
EUR 12.10 EUR 15.00
Copies, prints EUR 8.06 EUR 10.00
Usage report EUR 20.16/location EUR 25.00/location
Sending consumption history information of the location of use via EDI messages EUR 40.00/location of use
EUR 49.60/location of use
Fee collection visit to the customer EUR 64.52 EUR 80.00
Late fee, payment reminder, deactivation warning
Interest on late payments is charged in accordance with the interest on late payments as defined by the Bank of Finland.
EUR5.00  
Refund of excess payment EUR 8.06 EUR 10.00
For services not included in the price list,
the amount corresponding to the work time used shall
be charged hourly.
EUR 88.71/h EUR 110.00/h

Fees for activating and deactivating electricity due to late payment

Product VAT 0% VAT 24%
Activation during working hours, next business day EUR 40.32 EUR 50.00
Deactivation during working hours, next business day EUR 40.32 EUR 50.00
Activation as a separate order, same working day or outside office hours EUR 64.52 EUR 80.00

A deactivation requested by the electricity provider is subject to VAT, as is a deactivation requested by the customer. The deactivation fee is tax-free for the customer when the deactivation is made due to non-payment to the network company.

Electricity activation fee at the start of the network agreement

Product VAT 0% VAT 24%
Activation by 2 p.m. on the same business day EUR 0.00 EUR 0.00
Activation after 2 p.m. on the same business day or after office hours EUR 64.52 EUR 80.00

The energy supply begins when the customer has a valid contract. When the customer moves away from the location of use, the electricity supply is deactivated.

Replacement of a network service product

Product VAT 0% VAT 24%
Replacement when less than 12 months have elapsed since the last replacement EUR 16.13 EUR 20.00
Replacement when at least 12 months have elapsed since the last replacement EUR 0.00 EUR 0.00

Compensation calculation service

Distribution of the customer’s own generation among the energy community
or a group of active customers. Any changes to the calculation shall be made on an hourly basis.

Product VAT 0% VAT 24%
Establishment of a compensation calculation EUR 241.94 EUR 300.00
Monthly fee of the compensation calculation service,
EUR/calculation
EUR 8.06 EUR 10.00

Price for replacing the main fuse

If the fuses are located in the customer's switchboard, we will charge a fee according to the price list for the replacement of the main fuse. If the fuses are on Oulun Energia Sähköverkko Oy's network, on a pole or in a street distribution cabinet, and this is the first main fuse to blow in the last 12 months, the replacement is free of charge.

Prices include 24% VAT.

Product Price (VAT 24%)
First main fuse replacement in a 12-month period EUR 0.00

 

Product Price (VAT 24%)
Repeated 25-63 A main fuse replacement  
Weekdays from 7 a.m. to 4 p.m. EUR 123.00
At other times EUR 164.00

 

Product Price (VAT 24%)
Repeated replacement of a main fuse over 63 A  
Weekdays from 7 a.m. to 4 p.m. EUR 164.00
At other times EUR 232.00

Activation fees

We will charge a fee according to the price list for the activation of construction site connections. The activation of fixed lines is included in the connection fee. The delivery time of the activations is in accordance with the connection contract. We will charge an additional fee according to the price list for an accelerated activation.

Prices include 24% VAT. Metering fees will be charged separately, if necessary.

Activation fees for a construction site and other temporary distribution boards, connection to an existing part of the network (e.g., cable end, distribution board, substation, pole), including installation and dismantling

Product Price (VAT 24%)
25 A EUR 200.00
63 A EUR 300.00
125 A EUR 550.00
160-250 A EUR 750.00
315-630 A EUR 960.00

Temporary medium-voltage connection to an existing part of the network, including up to 10 m of cabling, terminals, connection to the network, and dismantling. Connection power according to network capacity, transformer.

Product Price (VAT 24%)
Power according to network capacity, transformer EUR 12,000.00

 

Activating or moving the connection cable with the main fuse size unchanged, including activations and creating an extension

Product Price (VAT 24%)
Connection 25-35 A EUR 200.00
Connection 50-63 A EUR 300.00
Connection 80-125 A EUR 550.00
Connection 160-250 A EUR 750.00
Connection 315-630 A
EUR 960.00

For example, moving the electricity switchboard or connection cable on a property, with the main fuse size unchanged. The price includes the activation and creating an extension. Metering fees will be charged separately, if necessary.

Decreasing the connection

Product Price (VAT 24%)
Main fuse in the switchboard
The work is carried out by the customer's electrical contractor
EUR 0.00

Main fuse as a part of the network of the network company, e.g., in the distribution cabinet. The connection contract remains unchanged.

Product Price (VAT 24%)
Connection 25-63 A EUR 123.00
Connection 80-630 A EUR 164.00

Activation of the medium-voltage network

Product Price (VAT 24%)
Activation plan EUR 99.00
Customer order of the activation of the medium-voltage network
EUR 81/h

Other charges

Product Price (VAT 24%)
Unnecessary visit EUR 124.00

Metering fees

Metering

Product Price (VAT 24%)
Direct metering, up to 3 x 63 A EUR 0.00
Power metering EUR 0.00

Other metering work

Product
Price (VAT 24%)
Meter transfer in connection with connection work, when changing the metering board
Up to two meters transferred per visit
EUR 93.00/visit
Unnecessary meter change or inspection
Change or inspection of a 1- or 3-phase meter at the request of an electricity user that has been found to be unnecessary
EUR 175.00
Other changes to meters at the location of use EUR 93.00/h
Arranging energy impulse information for the electricity customer
Exchanges of measuring devices or changes to metering arrangements are not included in the fee
EUR 0.00

Remote metering

Product Price (VAT 24%)
Establishment fee for the remote metering of an electricity connection EUR 124.00
Deployment of the remote metering for a location of use EUR 31.00
Other work related to remote metering EUR 105.00/h

Installer's hourly rate (e.g., street and traffic lights, electricity, telecommunications and distribution networks, mapping, and cable display)

Product VAT 0% VAT 24%
Normal EUR 70.90 EUR 88.00
Overtime 50% EUR 96.96 EUR 119.00
Overtime 100% EUR 120.96 EUR 150.00
Overtime 200% EUR 170.96 EUR 212.00

 

Charge for vehicles and transport (driver at a separate hourly rate)

Product
VAT 0%
VAT 24%
Van
EUR 0.97
EUR 1.20
Truck EUR 3.50 EUR 4.34
Bucket truck EUR 53.50 EUR 66.34
Snowmobile/quad bike EUR 45.00 EUR 55.80

Other charges (such as materials, extra fees, external services, etc.)

External services according to the actual costs plus 12% handling costs.

Other expenses according to the actual costs plus 25% handling costs.