Search
close
Go to the content
Suomi
English
search
Search
search
Hae
Breadcrumbs
Front page
Site search
Results for ""
Your search found
403
hit(s).
All results
Blogs
News
Instructions
Forms
Search
Development of the Merikoski area
The construction of the Merikoski power plant in the 1940s closed the lower part of the Oulujoki river catchment area with a dam. The construction of the hydroelectric power plant had a significant impact on aquatic organisms and especially on migratory fish. The Merikoski dam obstructed fish migration to the Oulujoki river and resulted in the destruction of the breeding grounds upstream during its construction. Flow regulation and alterations affect ecosystems by limiting the natural fluctuations in water levels.
Moving
I've bought a detached house and I'm moving in. Is it enough for me to sign an electricity contract for my new address?
Faults
I live in a building heated with district heating, and so far the house has been suitably warm, but now the radiators are cold. What should I do?
Electricity network
When does the Energy Authority investigate whether the pricing of the network service is reasonable?
Electricity network
Does someone monitor the increase in the prices of the network service, and what is the basis for monitoring?
Prices and contracts
What is a network service?
Underground cabling
Why is it useful to use underground cabling?
Prices and contracts
Why does the electricity company charge a fixed fee?
Prices and contracts
Can I shop around for a network service?
Prices and contracts
Why does the fuse size affect the fixed fee?
1
2
3
4
5
41
keyboard_arrow_right